For the last week the spur to the ADM mill off of Ogden has been completely replaced. Also looks like some tracks in the small yard as well. It was in really bad shape comprised of an assortment of spare rails; different rail weights and ages going as far back as 1913? if I remember correctly. Will Try to post pics. They haven't had a delivery the whole time which adds up to approx. 70 to 90 loads. Saw the track being ripped up and was glad to see it was replacement and not permanent removal. Mill is switched every night usually 10 to 12 cars. Time varies from 7 to midnight. Predominantly switched by NS but have seen old green BN, BNSF, CP, and CN as well.
Joe