Project to reconfigure the Fullerton-Elston-Damen intersection will take some of the former right of way that use to exist in the area. In the pictures, you can see the former railroad right of way.
Here is the link to the project:
http://www.cityofchicago.org/city/en/depts/cdot/supp_info/damen-elston-fullertonintersectionimprovement.html
http://www.cityofchicago.org/content/dam/city/depts/cdot/DEF-Hearing-Exhibits_11x17.pdf
http://www.cityofchicago.org/content/dam/city/depts/cdot/CDOTProjects/DEF-Overall-withAerial-020212.pdf